Lizhong Industrial Plant

Monterrey

Project and construction supervision of an industrial plant with a land area of ​​188,641 m² located in the Interpuerto Monterrey industrial park in the municipality of Salinas Victoria, Nuevo León, Mexico.

According to the information received by the client, Navarro & Cal y Mayor carries out the supervision of the project during the Pre-Construction Phase, Construction, on a property of 180,000 square meters, divided into two stages: Stage 1: 61,500 m² and Stage 2: 54,546 m² and the closure of the work.

Scopes of the project

  • Coordination of architectural project and engineering.
  • Value Engineering.
  • Elaboration of basic budget.
  • Costs control.
  • Construction programming, flows and resources.
  • Tenders and contracting.
  • Construction supervision.
  • Quality control and monitoring.
  • Supervisión de entrega – recepción del inmueble.

Client

Lizhong Group

Project date

January 2022 – September 2023